IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0029 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,879 $3,000 Implemented
SD0029 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $436 $73 Implemented
SD0029 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $173 Implemented
RU0160 # 07 Y:1992 07 1992 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $9,901 $11,500 Implemented
RU0160 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,367 $507 Implemented
RU0160 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $0 Implemented
RU0160 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,501 $849 Implemented
RU0160 # 03 Y:1992 03 1992 COVER OPEN TANKS $1,112 $350 Implemented
RU0160 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $707 $322 Implemented
RU0160 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,237 $12,750 Implemented
HO0018 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,154 $5,700 Implemented
HO0018 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $180 Implemented
HO0018 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $1,735 Implemented
KU0373 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $180 Implemented
UD0373 # 04 Y:1992 04 1992 METER WASTE WATER $14,996 $300,000 Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
KU0373 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $331 $101 Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
OK0379 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,070 $2,500 Implemented
OK0379 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $89 $108 Implemented
OK0379 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,182 $200 Implemented
OK0379 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $0 Implemented
CO0245 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,770 $1,600 Implemented
CO0245 # 02 Y:1992 02 1992 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $240 $150 Implemented
CO0245 # 06 Y:1992 06 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $220 $250 Implemented