IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
WV0219 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $889 $100 Implemented
WV0219 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,960 $2,070 Implemented
WV0219 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $659 $1,140 Implemented
WV0219 # 04 Y:2001 04 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,765 $600 Implemented
WV0219 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $209 $100 Not Implemented
WV0219 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,137 $21,787 Implemented
WV0219 # 07 Y:2001 07 2001 USE PHOTOCELL CONTROLS $548 $300 Not Implemented
WV0219 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,318 $40 Implemented
WV0219 # 09 Y:2001 09 2001 INSULATE BARE EQUIPMENT $1,097 $64 Implemented
WV0219 # 10 Y:2001 10 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,137 $4,500 Not Implemented
WV0219 # 11 Y:2001 11 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,137 $4,400 Not Implemented
WV0219 # 12 Y:2001 12 2001 BURN WASTE OIL FOR HEAT $1,298 $4,470 Not Implemented
WV0219 # 13 Y:2001 13 2001 METER WASTE WATER $2,332 $800 Implemented
WV0219 # 14 Y:2001 14 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $50,000 $26,800 Not Implemented
UD0618 # 01 Y:2001 01 2001 INCREASE USE OF AUTOMATION $124,000 $240,000 Not Implemented
UD0618 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,445 $5,700 Not Implemented
UD0618 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,036 $25,000 Not Implemented
UD0618 # 04 Y:2001 04 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $8,474 $6,280 Implemented
UD0618 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,038 $1,450 Implemented
UD0618 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,458 $5,700 Not Implemented
UD0618 # 07 Y:2001 07 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $4,522 $3,000 Not Implemented
UD0618 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,394 $0 Not Implemented
UD0618 # 09 Y:2001 09 2001 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $1,779 $5,000 Not Implemented
UD0618 # 10 Y:2001 10 2001 METER WASTE WATER $1,284 $500 Not Implemented