Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0038 # 01 Y:2003 01 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,172 $948 Not Implemented
UU0038 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,938 $4,181 Not Implemented
UU0038 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,673 $190 Implemented
UU0038 # 04 Y:2003 04 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $710 $600 Not Implemented
UU0038 # 05 Y:2003 05 2003 INSTALL SKYLIGHTS $11,724 $16,000 Not Implemented
UU0038 # 06 Y:2003 06 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,359 $600 Not Implemented
UU0038 # 07 Y:2003 07 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $897 $4,226 Not Implemented
UU0038 # 08 Y:2003 08 2003 ELIMINATE/REDUCE AN OPERATION $600 $500 Not Implemented
UF0310 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,954 $340 Not Implemented
UF0310 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $57,004 $97,500 Not Implemented
UF0310 # 03 Y:2002 03 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $27,021 $84,100 Not Implemented
UF0310 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,473 $10,800 Not Implemented
UF0310 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $16,134 $32,723 Not Implemented
UF0310 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $1,828 $1,339 Not Implemented
UF0310 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,038 $0 Not Implemented
UF0310 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,690 $19,381 Not Implemented
UF0310 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,920 $1,895 Not Implemented
NC0250 # 01 Y:2002 01 2002 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $13,524 $16,000 n/a
NC0250 # 02 Y:2002 02 2002 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $37,000 $12,000 n/a
NC0250 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $11,259 $20,000 Not Implemented
NC0250 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $12,244 $12,245 Not Implemented
NC0250 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $65,851 $10,750 Not Implemented
NC0250 # 06 Y:2002 06 2002 INSTALL BACK-UP EQUIPMENT $13,440 $35,000 Not Implemented
NC0250 # 07 Y:2002 07 2002 DEVELOP A REPAIR/REPLACE POLICY $798 $1,293 Not Implemented
NC0250 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $322 $921 Not Implemented