Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LL0140 # 01 Y:2002 | 01 | 2002 | OPTIMIZE PLANT POWER FACTOR | $12,791 | $19,845 | Not Implemented |
LL0140 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,175 | $525 | Implemented |
LL0140 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,129 | $0 | Not Implemented |
LL0140 # 04 Y:2002 | 04 | 2002 | INSTALL OCCUPANCY SENSORS | $904 | $520 | Not Implemented |
LL0140 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $772 | $345 | Implemented |
LL0140 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $296 | $120 | Implemented |
LL0140 # 07 Y:2002 | 07 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $108 | $0 | Not Implemented |
IC0038 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,057 | $2,300 | n/a |
IC0038 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,313 | $13,137 | n/a |
IC0038 # 03 Y:2002 | 03 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $487 | $2,536 | n/a |
IC0038 # 04 Y:2002 | 04 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,392 | $27,900 | n/a |
IC0038 # 05 Y:2002 | 05 | 2002 | AUTOMATE PAYROLL SYSTEM | $19,920 | $8,340 | n/a |
MI0039 # 01 Y:2002 | 01 | 2002 | MOVE PRODUCT USING MECHANICAL MEANS | $115,650 | $10,000 | n/a |
MI0039 # 02 Y:2002 | 02 | 2002 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $73,631 | $42,600 | n/a |
MI0039 # 03 Y:2002 | 03 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,440 | $3,600 | n/a |
MI0039 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,734 | $1,300 | n/a |
MI0039 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,717 | $7 | n/a |
TA0028 # 01 Y:2002 | 01 | 2002 | PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW | $36,360 | $0 | Not Implemented |
TA0028 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,860 | $600 | Implemented |
TA0028 # 03 Y:2002 | 03 | 2002 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $13,237 | $0 | Implemented |
TA0028 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,290 | $40 | Implemented |
TA0028 # 05 Y:2002 | 05 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,380 | $0 | Implemented |
TA0028 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,105 | $390 | Implemented |
MA0512 # 01 Y:2002 | 01 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $38,408 | $75,000 | Not Implemented |
MA0512 # 02 Y:2002 | 02 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $29,628 | $24,650 | Not Implemented |