IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0101 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $78,362 $2,500 Implemented
LE0101 # 04 Y:2001 04 2001 IMPROVE LUBRICATION PRACTICES $3,752 $800 Implemented
LE0101 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $89,879 $0 Implemented
LE0101 # 06 Y:2001 06 2001 CLOSE OFF UNNEEDED STEAM LINES $3,984 $2,000 Implemented
LE0101 # 07 Y:2001 07 2001 USE OPTIMUM THICKNESS INSULATION $5,167 $2,000 Implemented
LL0101 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $646 $854 Not Implemented
LL0101 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $478 $1,200 Not Implemented
LL0101 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,840 $6,234 Not Implemented
LL0101 # 04 Y:2001 04 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $153 $268 Implemented
LL0101 # 05 Y:2001 05 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $248 $424 Implemented
LL0101 # 06 Y:2001 06 2001 REDUCE SCRAP PRODUCTION $1,788 $0 Implemented
OK0610 # 01 Y:2001 01 2001 INSTALL SET-BACK TIMERS $14,000 $1,670 Implemented
OK0610 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,700 $1,110 Not Implemented
OK0610 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,939 $16,000 Not Implemented
OK0610 # 04 Y:2001 04 2001 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $2,420 $1,235 Not Implemented
OK0610 # 05 Y:2001 05 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $312,000 $150,000 Not Implemented
NC0206 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $373 $100 Not Implemented
NC0206 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,202 $2,000 Not Implemented
NC0206 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $270 Implemented
NC0206 # 04 Y:2001 04 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $204 $525 Implemented
NC0206 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,083 $32,849 Not Implemented
NC0206 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $307 $65 Not Implemented
NC0206 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,568 $0 Not Implemented
NC0206 # 08 Y:2001 08 2001 REDESIGN PROCESS $9,810 $40,000 Implemented
NC0206 # 09 Y:2001 09 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,200 $2,500 Not Implemented