IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0350 # 01 Y:1999 01 1999 OPTIMIZE PLANT POWER FACTOR $10,000 $19,540 Implemented
AM0350 # 02 Y:1999 02 1999 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,600 $3,800 Implemented
AM0350 # 03 Y:1999 03 1999 METER WASTE WATER $5,200 $8,500 Not Implemented
AM0350 # 04 Y:1999 04 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,545 $0 Implemented
AM0350 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $1,130 $670 Implemented
AM0350 # 06 Y:1999 06 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,122 $0 Implemented
AM0350 # 07 Y:1999 07 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,040 $250 Implemented
AM0350 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $19 Not Implemented
AM0350 # 09 Y:1999 09 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $900 $0 Implemented
AM0350 # 10 Y:1999 10 1999 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $149 $150 Not Implemented
SD0218 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,815 $240 Implemented
SD0218 # 02 Y:1999 02 1999 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $62,663 $2,000 Not Implemented
SD0218 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $39,599 $12,550 Not Implemented
SD0218 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $40,547 $65,000 Not Implemented
SD0218 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $49,560 $10,000 Not Implemented
SD0218 # 06 Y:1999 06 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,441 $102,000 Not Implemented
SD0218 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,085 $18,000 Not Implemented
SD0218 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,000 $0 Implemented
SD0218 # 09 Y:1999 09 1999 CONVERT TO AQUEOUS CLEANING SYSTEM $2,926 $1,000 Not Implemented
SD0217 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,485 $1,420 Not Implemented
SD0217 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $953 $2,268 Not Implemented
SD0217 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,351 $300 Not Implemented
SD0217 # 04 Y:1999 04 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,614 $500 Implemented
SD0217 # 05 Y:1999 05 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,938 $3,800 Not Implemented
SD0217 # 06 Y:1999 06 1999 INSTALL SKYLIGHTS $520 $1,380 Not Implemented