IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0148 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,792 $850 Not Implemented
AR0148 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40,673 $1,200 Implemented
AR0148 # 06 Y:1998 06 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $39,295 $91,825 Implemented
AR0148 # 07 Y:1998 07 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $6,000 Not Implemented
AR0148 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,787 $1,000 Implemented
AR0148 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,143 $0 Not Implemented
IA0200 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,523 $705 Implemented
IA0200 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,997 $12,390 Not Implemented
IA0200 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $2,164 Not Implemented
IA0200 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,340 $2,300 Not Implemented
IA0200 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,154 $2,648 Not Implemented
IA0200 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $710 $1,264 Not Implemented
IA0200 # 07 Y:1998 07 1998 ELIMINATE/REDUCE AN OPERATION $64,956 $0 Not Implemented
IA0200 # 08 Y:1998 08 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $278,349 $25,000 Not Implemented
IA0200 # 09 Y:1998 09 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $38,310 $11,590 Not Implemented
IA0200 # 10 Y:1998 10 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $27,121 $4,200 Implemented
KU0498 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,010 $4,150 Not Implemented
KU0498 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,610 $650 Implemented
KU0498 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $570 Implemented
KU0498 # 04 Y:1998 04 1998 USE SYNTHETIC LUBRICANT $360 $980 Not Implemented
KU0498 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $630 Implemented
KU0498 # 06 Y:1998 06 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $320 $0 Implemented
KU0498 # 07 Y:1998 07 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $250 $970 Not Implemented
KU0498 # 08 Y:1998 08 1998 IMPLEMENT A MACHINE AND COOLANT SUMP CLEANING PROGRAM TO MINIMIZE COOLANT CONTAMINATION $3,150 $1,450 Implemented
KU0498 # 09 Y:1998 09 1998 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $2,930 $3,000 Not Implemented