IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0461 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,000 $1,920 Implemented
AM0461 # 03 Y:2004 03 2004 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,560 $5,000 Not Implemented
AM0461 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,630 $20 Implemented
AM0461 # 05 Y:2004 05 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,730 $0 Implemented
AM0461 # 06 Y:2004 06 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,480 $0 Implemented
AM0461 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $3,430 $900 Implemented
AM0461 # 08 Y:2004 08 2004 INSTALL SKYLIGHTS $2,600 $6,200 Implemented
AM0461 # 09 Y:2004 09 2004 INSTALL SKYLIGHTS $2,230 $5,400 Not Implemented
AM0461 # 10 Y:2004 10 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,350 $200 Implemented
AM0461 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,255 $360 Implemented
AM0461 # 12 Y:2004 12 2004 PAY UTILITY BILLS ON TIME $370 $0 Implemented
AM0461 # 13 Y:2004 13 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $360 $27 Implemented
AM0443 # 01 Y:2003 01 2003 INSTALL EQUIPMENT TO MOVE PRODUCT $51,825 $25,200 n/a
AM0443 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $19,270 $2,100 n/a
AM0443 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,700 $700 n/a
AM0443 # 04 Y:2003 04 2003 USE SYNTHETIC LUBRICANT $2,660 $0 n/a
AM0443 # 05 Y:2003 05 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,590 $250 n/a
AM0443 # 06 Y:2003 06 2003 REUSE RAGS UNTIL COMPLETELY SOILED $970 $0 n/a
AM0443 # 07 Y:2003 07 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $200 $50 n/a
AM0443 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $110 $115 n/a
TA0061 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $31,140 $17,080 Implemented
TA0061 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,330 $240 Not Implemented
TA0061 # 03 Y:2003 03 2003 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,000 $300 Implemented
TA0061 # 04 Y:2003 04 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,870 $435 Implemented
TA0061 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,100 $1,730 Not Implemented