IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,111

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,490 $7,600 Implemented
AR0028 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $913 Implemented
AR0028 # 04 Y:1994 04 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,367 $495 Implemented
AR0028 # 05 Y:1994 05 1994 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $37,510 $30,000 Not Implemented
AR0028 # 06 Y:1994 06 1994 AIR CONDITION ONLY SPACE NECESSARY $2,792 $1,000 Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 05 Y:1994 05 1994 METER WASTE WATER $18,700 $1,350 Not Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
MS0001 # 01 Y:1994 01 1994 INSTALL TIMERS AND/OR THERMOSTATS $15,400 $2,700 Not Implemented
MS0001 # 02 Y:1994 02 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,346 $1,500 Not Implemented
MS0001 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $10,156 Not Implemented
MS0001 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $4,580 $4,500 Not Implemented
MS0001 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,165 $3,540 Implemented
MS0001 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $372 $144 Implemented
MS0001 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $124 $33 Implemented
ME0133 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $2,688 $4,500 Not Implemented
ME0133 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,453 $6,650 Not Implemented
ME0133 # 03 Y:1994 03 1994 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $5,276 $7,200 Not Implemented
BD0009 # 01 Y:1994 01 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $8,608 $12,904 Not Implemented
BD0009 # 02 Y:1994 02 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,553 $5,412 Not Implemented
BD0009 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,666 $1,430 Implemented