Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
356
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0169 # 10 Y:2023 | 10 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,071 | $15,432 | Implemented |
IP0169 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,807 | $69 | Implemented |
IP0169 # 14 Y:2023 | 14 | 2023 | DISCONNECT BALLASTS | $7 | $20 | Implemented |
IP0169 # 03 Y:2023 | 03 | 2023 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $141 | $0 | Implemented |
IP0169 # 15 Y:2023 | 15 | 2023 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $10,836 | $47,613 | Not Implemented |
IP0169 # 13 Y:2023 | 13 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,020 | $7,379 | Implemented |
UD1023 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,553 | $5,220 | Not Implemented |
UD1023 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $218 | $0 | Not Implemented |
UD1023 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $163 | $0 | Not Implemented |
UD1023 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33,329 | $14,912 | Not Implemented |
UD1023 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,341 | $0 | Not Implemented |
UD1023 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,275 | $3,000 | Not Implemented |
UD1023 # 07 Y:2020 | 07 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $605 | $340 | Not Implemented |
UD1023 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $936 | $1,600 | Not Implemented |
UD1023 # 10 Y:2020 | 10 | 2020 | INSTALL OCCUPANCY SENSORS | $904 | $560 | Not Implemented |
UD1023 # 11 Y:2020 | 11 | 2020 | REPLACE BOILER | $6,824 | $18,600 | Not Implemented |
UD1023 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,882 | $0 | Not Implemented |
WV0565 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,443 | $80,480 | Not Implemented |
WV0565 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $810 | $1,600 | Implemented |
WV0565 # 07 Y:2018 | 07 | 2018 | USE EVAPORATION TO CONCENTRATE MATERIAL | $733 | $1,750 | Not Implemented |
WV0565 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $2,854 | $533 | Implemented |
WV0565 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $77,310 | $17,740 | Implemented |
WV0565 # 03 Y:2018 | 03 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,434 | $68,000 | Not Implemented |
WV0565 # 05 Y:2018 | 05 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,441 | $500 | Implemented |
WV0565 # 08 Y:2018 | 08 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $704 | $40 | Implemented |