IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0069 # 06 Y:1992 06 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $10,010 $349,500 Not Implemented
AS0069 # 07 Y:1992 07 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,715 $4,900 Not Implemented
AS0069 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,565 $17,450 Not Implemented
AS0069 # 09 Y:1992 09 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,137 $400 Not Implemented
RU0160 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $0 Implemented
RU0160 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,501 $849 Implemented
RU0160 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,367 $507 Implemented
RU0160 # 03 Y:1992 03 1992 COVER OPEN TANKS $1,112 $350 Implemented
RU0160 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,237 $12,750 Implemented
AS0069 # 10 Y:1992 10 1992 IMPROVE LUBRICATION PRACTICES $1,744 $4,914 Not Implemented
SD0029 # 03 Y:1992 03 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,064 $638 Not Implemented
SD0029 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $1,298 $800 Not Implemented
HO0018 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,154 $5,700 Implemented
HO0018 # 03 Y:1992 03 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $69,237 $330,000 Not Implemented
HO0018 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $180 Implemented
HO0018 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,104 $1,735 Implemented
KU0373 # 01 Y:1992 01 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $823 $3,076 Not Implemented
KU0373 # 03 Y:1992 03 1992 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $572 $385 Not Implemented
KU0373 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $793 $935 Not Implemented
UD0373 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $6,664 $8,600 Implemented
UD0373 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,143 $15,000 Not Implemented
UD0373 # 02 Y:1992 02 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,724 $0 Implemented
KU0373 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $180 Implemented
KU0373 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $543 $570 Not Implemented
KU0373 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $331 $101 Implemented