Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0400 # 02 Y:2012 | 02 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,755 | $17,500 | Not Implemented |
UM0400 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,282 | $47,885 | Not Implemented |
UM0373 # 06 Y:2010 | 06 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,651 | $6,300 | Not Implemented |
UM0373 # 05 Y:2010 | 05 | 2010 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $5,428 | $1,040 | Not Implemented |
UM0373 # 04 Y:2010 | 04 | 2010 | INSTALL OCCUPANCY SENSORS | $870 | $828 | Not Implemented |
UM0373 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,127 | $4,000 | Not Implemented |
UM0373 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,961 | $200 | Not Implemented |
UM0373 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,156 | $44,196 | Not Implemented |
UM0363 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $542 | $1,568 | Implemented |
UM0363 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $2,173 | $1,375 | Implemented |
UM0363 # 05 Y:2010 | 05 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,241 | $1,000 | Implemented |
UM0363 # 04 Y:2010 | 04 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,792 | $200 | Not Implemented |
UM0363 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,516 | $500 | Not Implemented |
UM0363 # 02 Y:2010 | 02 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,498 | $10,000 | Implemented |
UM0363 # 01 Y:2010 | 01 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,083 | $500 | Implemented |
IC0147 # 02 Y:2008 | 02 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $35,889 | $55,200 | Implemented |
IC0147 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,453 | $75,348 | Implemented |
IC0147 # 15 Y:2008 | 15 | 2008 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $5,100 | $0 | Implemented |
IC0147 # 14 Y:2008 | 14 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,784 | $8,670 | Implemented |
IC0147 # 13 Y:2008 | 13 | 2008 | UPGRADE OBSOLETE EQUIPMENT | $17,075 | $5,520 | Implemented |
IC0147 # 12 Y:2008 | 12 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,138 | $1,380 | Implemented |
IC0147 # 11 Y:2008 | 11 | 2008 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,598 | $9,911 | Implemented |
IC0147 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,527 | $30,225 | Implemented |
IC0147 # 09 Y:2008 | 09 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $200 | $246 | Implemented |
IC0147 # 03 Y:2008 | 03 | 2008 | INSTALL OCCUPANCY SENSORS | $1,712 | $2,967 | Implemented |