Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
190
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0286 # 10 Y:2004 | 10 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $61 | $70 | Not Implemented |
NC0286 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,566 | $6,500 | Not Implemented |
NC0250 # 09 Y:2002 | 09 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,251 | $420 | Implemented |
NC0250 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $322 | $921 | Not Implemented |
NC0250 # 07 Y:2002 | 07 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $798 | $1,293 | Not Implemented |
NC0250 # 06 Y:2002 | 06 | 2002 | INSTALL BACK-UP EQUIPMENT | $13,440 | $35,000 | Not Implemented |
NC0250 # 05 Y:2002 | 05 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $65,851 | $10,750 | Not Implemented |
NC0250 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,244 | $12,245 | Not Implemented |
NC0250 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,259 | $20,000 | Not Implemented |
NC0250 # 02 Y:2002 | 02 | 2002 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $37,000 | $12,000 | n/a |
NC0250 # 01 Y:2002 | 01 | 2002 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $13,524 | $16,000 | n/a |
NC0206 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $589 | $270 | Implemented |
NC0206 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $373 | $100 | Not Implemented |
NC0206 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,202 | $2,000 | Not Implemented |
NC0206 # 04 Y:2001 | 04 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $204 | $525 | Implemented |
NC0206 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,083 | $32,849 | Not Implemented |
NC0206 # 07 Y:2001 | 07 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,568 | $0 | Not Implemented |
NC0206 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $307 | $65 | Not Implemented |
NC0206 # 10 Y:2001 | 10 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,210 | $6,000 | Not Implemented |
NC0206 # 08 Y:2001 | 08 | 2001 | REDESIGN PROCESS | $9,810 | $40,000 | Implemented |
NC0206 # 09 Y:2001 | 09 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,200 | $2,500 | Not Implemented |
NC0154 # 04 Y:1998 | 04 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,693 | $5,000 | n/a |
NC0154 # 03 Y:1998 | 03 | 1998 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,295 | $825 | n/a |
NC0154 # 02 Y:1998 | 02 | 1998 | CLOSE OFF UNNEEDED STEAM LINES | $2,893 | $3,000 | n/a |
NC0154 # 01 Y:1998 | 01 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,913 | $15,000 | n/a |