Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
356
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0978 # 09 Y:2017 | 09 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $562 | $0 | Not Implemented |
UD0978 # 08 Y:2017 | 08 | 2017 | COVER OPEN TANKS | $7,466 | $5,000 | Not Implemented |
UD0978 # 07 Y:2017 | 07 | 2017 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $37,937 | $100,000 | Not Implemented |
UD0978 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $86,982 | $91,480 | Not Implemented |
UD0978 # 05 Y:2017 | 05 | 2017 | ADD AREA LIGHTING SWITCHES | $2,220 | $180 | Not Implemented |
UD0978 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79,415 | $79,850 | Not Implemented |
UD0978 # 03 Y:2017 | 03 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,562 | $1,000 | Not Implemented |
UD0978 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,107 | $1,000 | Not Implemented |
UD0978 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $0 | Not Implemented |
UD0949 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,996 | $57,770 | Implemented |
UD0949 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $66 | $500 | Not Implemented |
UD0949 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $1,000 | Implemented |
UD0949 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,976 | $4,120 | Not Implemented |
UD0949 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,691 | $2,800 | Not Implemented |
UD0949 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,698 | $2,125 | Not Implemented |
UD0949 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,312 | $5,400 | Implemented |
WV0527 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $581 | $1,275 | Implemented |
WV0527 # 08 Y:2016 | 08 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,044 | $165 | Implemented |
WV0527 # 11 Y:2016 | 11 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $212 | $527 | Implemented |
WV0527 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $252 | $263 | Implemented |
WV0527 # 07 Y:2016 | 07 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,189 | $283 | Not Implemented |
WV0527 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,524 | $60 | Implemented |
WV0527 # 05 Y:2016 | 05 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,540 | $4,500 | Not Implemented |
WV0527 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,255 | $6,300 | Not Implemented |
WV0527 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,268 | $2,530 | Implemented |