IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

203

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0364 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $8,340 $22,377 Implemented
ND0364 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,206 $0 Implemented
ND0364 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $839 $600 Not Implemented
ND0364 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $575 Implemented
ND0364 # 05 Y:2000 05 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,221 $1,000 Not Implemented
ND0364 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75 $200 Implemented
ND0364 # 08 Y:2000 08 2000 MINIMIZE WATER USAGE $821 $2,875 Not Implemented
ND0364 # 07 Y:2000 07 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $605 $400 Not Implemented
UL0203 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $90,000 $155,600 Not Implemented
UL0203 # 05 Y:1998 05 1998 ELIMINATE/REDUCE AN OPERATION $109,700 $16,000 Not Implemented
UL0203 # 04 Y:1998 04 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $17,900 $8,860 Implemented
UL0203 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $762 $15 Implemented
UL0203 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $9,100 $20,100 Not Implemented
UL0203 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,115 $65 Implemented
UL0199 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,970 $10,350 Implemented
UL0199 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,343 $20 Implemented
UL0199 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,050 $0 Not Implemented
UL0199 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,750 $0 Implemented
UL0199 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,416 $20,821 Not Implemented
UL0199 # 04 Y:1998 04 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,400 $0 Not Implemented
ND0288 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $380 $770 Not Implemented
ND0288 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $891 $3,110 Not Implemented
ND0288 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,442 $90 Not Implemented
ND0288 # 01 Y:1997 01 1997 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,843 $8,160 Not Implemented
ND0288 # 02 Y:1997 02 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,456 $68 Not Implemented