IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0823 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $500 Not Implemented
UD0823 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $524 $25 Implemented
UD0823 # 11 Y:2010 11 2010 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $19,629 $7,500 Not Implemented
UD0823 # 12 Y:2010 12 2010 USE OPTIMUM TEMPERATURE $3,244 $63 Not Implemented
UD0823 # 13 Y:2010 13 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,010 $50,050 Implemented
UD0823 # 14 Y:2010 14 2010 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,832 $9,160 Not Implemented
UD0823 # 15 Y:2010 15 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $355 $25 Implemented
UD0802 # 01 Y:2009 01 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $13,072 $16,185 Not Implemented
UD0802 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,384 $29,087 Implemented
UD0802 # 03 Y:2009 03 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,645 $0 Implemented
UD0802 # 04 Y:2009 04 2009 INSTALL AUTOMATIC STACK DAMPER $3,637 $1,000 Not Implemented
UD0802 # 05 Y:2009 05 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,711 $6,468 Not Implemented
UD0802 # 06 Y:2009 06 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,230 $1,500 Implemented
UD0802 # 07 Y:2009 07 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,084 $2,812 Not Implemented
UD0802 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $797 $1,907 Implemented
UD0802 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $2,374 Implemented
UD0802 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,334 $1,000 Implemented
UD0802 # 11 Y:2009 11 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $194 $0 Not Implemented
UD0739 # 01 Y:2006 01 2006 $41,626 $4,000 Implemented
UD0739 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $11,417 $3,300 Not Implemented
UD0739 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,822 $23,400 Not Implemented
UD0739 # 04 Y:2006 04 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,397 $0 Implemented
UD0739 # 05 Y:2006 05 2006 $1,391 $30 Implemented
UD0739 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $1,049 $387 Implemented
UD0739 # 07 Y:2006 07 2006 UPGRADE CONTROLS ON COMPRESSORS $873 $1,900 Not Implemented