Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
356
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0739 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $600 | $0 | Implemented |
UD0739 # 09 Y:2006 | 09 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $539 | $540 | Not Implemented |
UD0739 # 10 Y:2006 | 10 | 2006 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $109 | $0 | Implemented |
UD0739 # 11 Y:2006 | 11 | 2006 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $104 | $0 | Implemented |
WV0331 # 01 Y:2006 | 01 | 2006 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $15,465 | $18,600 | Not Implemented |
WV0331 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,865 | $22,825 | Implemented |
WV0331 # 03 Y:2006 | 03 | 2006 | REDUCE VENTILATION AIR | $9,874 | $3,940 | Not Implemented |
WV0331 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $3,957 | $2,264 | Implemented |
WV0331 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,906 | $1,560 | Implemented |
WV0331 # 06 Y:2006 | 06 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,523 | $320 | Implemented |
WV0331 # 07 Y:2006 | 07 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,352 | $1,000 | Implemented |
WV0331 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $778 | $1,460 | Implemented |
WV0331 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $686 | $440 | Implemented |
WV0331 # 10 Y:2006 | 10 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $566 | $1,370 | Not Implemented |
WV0331 # 11 Y:2006 | 11 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $438 | $30 | Not Implemented |
UD0714 # 01 Y:2005 | 01 | 2005 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $14,094 | $5,000 | Not Implemented |
UD0714 # 02 Y:2005 | 02 | 2005 | INSTALL EQUIPMENT TO MOVE PRODUCT | $13,500 | $10,000 | Not Implemented |
UD0714 # 03 Y:2005 | 03 | 2005 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $12,150 | $1,000 | Implemented |
UD0714 # 04 Y:2005 | 04 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $6,825 | $3,000 | Implemented |
UD0714 # 05 Y:2005 | 05 | 2005 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,482 | $2,000 | Not Implemented |
UD0714 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,427 | $14,204 | Not Implemented |
UD0714 # 07 Y:2005 | 07 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,772 | $165 | Implemented |
UD0714 # 08 Y:2005 | 08 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $1,972 | $150 | Implemented |
UD0714 # 09 Y:2005 | 09 | 2005 | MINIMIZE WATER USAGE | $1,311 | $1,200 | Implemented |
UD0714 # 10 Y:2005 | 10 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,296 | $0 | Implemented |