IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0582 # 10 Y:1996 10 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,144 $2,730 Not Implemented
TN0582 # 11 Y:1996 11 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,800 $360 Implemented
TN0582 # 12 Y:1996 12 1996 TREAT AND REUSE RINSE WATERS $1,120 $2,600 Not Implemented
UF0147 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $334 Implemented
UF0147 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $578 $0 Implemented
UF0147 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,865 $2,300 Implemented
UF0147 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,820 $450 Not Implemented
UF0147 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $500 Implemented
UF0147 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,681 $8,000 Not Implemented
UF0147 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,994 $0 Implemented
ND0238 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,350 $480 Not Implemented
ND0238 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,194 $14,890 Implemented
ND0238 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $779 $1,000 Not Implemented
ND0238 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,675 $807 Implemented
ND0238 # 05 Y:1996 05 1996 OPTIMIZE PLANT POWER FACTOR $934 $1,914 Not Implemented
ND0238 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $561 $300 Implemented
ND0238 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $705 $400 Not Implemented
ND0238 # 08 Y:1996 08 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $866 $20 Not Implemented
ND0238 # 09 Y:1996 09 1996 PAY UTILITY BILLS ON TIME $464 $0 Not Implemented
ND0238 # 10 Y:1996 10 1996 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,198 $1,080 Implemented
WV0088 # 01 Y:1996 01 1996 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,698 $4,800 Not Implemented
WV0088 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,333 $1,450 Implemented
WV0088 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $354 $365 Implemented
WV0088 # 04 Y:1996 04 1996 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $22,916 $56,250 Not Implemented
WV0088 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $680 Implemented