Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0344 # 03 Y:2004 | 03 | 2004 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $8,464 | $27,829 | Not Implemented |
SD0344 # 04 Y:2004 | 04 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,104 | $440 | Implemented |
SD0344 # 05 Y:2004 | 05 | 2004 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,399 | $18,500 | Implemented |
CO0547 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,630 | $1,790 | Not Implemented |
CO0547 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,590 | $4,680 | Implemented |
CO0547 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,360 | $570 | Implemented |
CO0547 # 04 Y:2004 | 04 | 2004 | COVER OPEN TANKS | $1,200 | $750 | Implemented |
CO0547 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $880 | $240 | Implemented |
CO0547 # 06 Y:2004 | 06 | 2004 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $300 | $420 | Implemented |
CO0547 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,320 | $27,720 | Not Implemented |
NC0286 # 01 Y:2004 | 01 | 2004 | ADD ADDITIONAL PRODUCTION SHIFT | $130,000 | $20,000 | Not Implemented |
NC0286 # 02 Y:2004 | 02 | 2004 | REDUCE VENTILATION AIR | $12,177 | $35,730 | Implemented |
NC0286 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,904 | $100 | Implemented |
NC0286 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,892 | $2,000 | Implemented |
NC0286 # 05 Y:2004 | 05 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $1,512 | $4,600 | Not Implemented |
NC0286 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,566 | $6,500 | Not Implemented |
NC0286 # 07 Y:2004 | 07 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $175 | $169 | Implemented |
NC0286 # 08 Y:2004 | 08 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,019 | $100 | Not Implemented |
NC0286 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $247 | $191 | Implemented |
NC0286 # 10 Y:2004 | 10 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $61 | $70 | Not Implemented |
WI0471 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,303 | $15,076 | Implemented |
WI0471 # 02 Y:2004 | 02 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,108 | $59,785 | Implemented |
WI0471 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,338 | $800 | Implemented |
WI0471 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $455 | $0 | Not Implemented |
WI0471 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $319 | $640 | Implemented |