IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0540 # 01 Y:2017 01 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,599 $10,000 Not Implemented
WV0540 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $1,394 $635 Implemented
WV0540 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $60 Implemented
WV0540 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,287 $713 Implemented
WV0540 # 08 Y:2017 08 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,154 $5,500 Not Implemented
WV0540 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $1,001 Implemented
WV0540 # 09 Y:2017 09 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $883 $3,150 Not Implemented
WV0540 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $129 $135 Implemented
WV0540 # 02 Y:2017 02 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $11,734 $40,000 Not Implemented
WV0540 # 03 Y:2017 03 2017 INSULATE FEEDWATER TANK $7,035 $3,286 Not Implemented
WV0540 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $3,005 $3,800 Not Implemented
WV0540 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $2,223 $6,400 Not Implemented
WV0540 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $2,370 Implemented
DL0114 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,930 $2,000 Not Implemented
DL0114 # 09 Y:2013 09 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $41,139 $70,800 Not Implemented
DL0114 # 08 Y:2013 08 2013 USE PHOTOCELL CONTROLS $100 $85 Not Implemented
DL0114 # 07 Y:2013 07 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,394 $7,600 Not Implemented
DL0114 # 06 Y:2013 06 2013 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $27,486 $11,000 Not Implemented
DL0114 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,080 $500 Not Implemented
DL0114 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,278 $2,350 Not Implemented
DL0114 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $12,684 $2,350 Not Implemented
DL0114 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,410 $2,000 Not Implemented
DL0093 # 06 Y:2012 06 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $940 $230 Not Implemented
DL0093 # 05 Y:2012 05 2012 REDUCE VENTILATION AIR $1,102 $600 Not Implemented
DL0093 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,360 $50 Not Implemented