Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
105
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
LS2507 # 02 Y:2025 | 02 | 2025 | INSTALL SUB-METERING EQUIPMENT | $3,463 | $3,000 | n/a |
LS2507 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,252 | $192,732 | n/a |
LS2507 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,714 | $65,000 | n/a |
LS2507 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $1,382 | $525 | n/a |
MS0440 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,155 | $0 | Implemented |
MS0440 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,241 | $17,637 | Implemented |
MS0440 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $79,176 | $275,000 | Not Implemented |
MS0440 # 04 Y:2024 | 04 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $193,096 | $2,257,766 | Not Implemented |
MS0440 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $622 | $2,945 | Not Implemented |
MS0430 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $80 | $1,259 | n/a |
MS0430 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,494 | $0 | n/a |
MS0430 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,708 | $984,550 | n/a |
MS0430 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $41,187 | $175,000 | n/a |
MS0424 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $74,358 | $275,000 | Not Implemented |
MS0424 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $50,990 | $507,500 | Not Implemented |
MS0424 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,613 | $19,215 | Implemented |
UA0093 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,498 | $2,500 | Implemented |
UA0093 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,514 | $1,600 | Not Implemented |
UA0093 # 01 Y:2013 | 01 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,477 | $15,565 | Not Implemented |