IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2507 # 02 Y:2025 02 2025 INSTALL SUB-METERING EQUIPMENT $3,463 $3,000 n/a
LS2507 # 03 Y:2025 03 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $44,252 $192,732 n/a
LS2507 # 04 Y:2025 04 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,714 $65,000 n/a
LS2507 # 01 Y:2025 01 2025 INSTALL TIMERS AND/OR THERMOSTATS $1,382 $525 n/a
MS0440 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $622 $2,945 n/a
MS0440 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $193,096 $2,257,766 n/a
MS0440 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $79,176 $275,000 n/a
MS0440 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,241 $17,637 n/a
MS0440 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,155 $0 n/a
MS0430 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $159,708 $984,550 n/a
MS0430 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $80 $1,259 n/a
MS0430 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,494 $0 n/a
MS0430 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $41,187 $175,000 n/a
MS0424 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,613 $19,215 Implemented
MS0424 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $50,990 $507,500 Not Implemented
MS0424 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $74,358 $275,000 Not Implemented
UA0093 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $8,477 $15,565 Not Implemented
UA0093 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,728 $0 Implemented
UA0093 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,514 $1,600 Not Implemented
UA0093 # 05 Y:2013 05 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $30,129 $6,665 Not Implemented
UA0093 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,498 $2,500 Implemented
MS0329 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $912 Not Implemented
MS0329 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,327 $7,955 Not Implemented
MS0329 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,660 $8,899 Not Implemented
MS0329 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,458 $256 Not Implemented