Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0386 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,405 | $32,776 | Not Implemented |
NC0386 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,493 | $6,490 | Not Implemented |
NC0386 # 06 Y:2009 | 06 | 2009 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,520 | $0 | Not Implemented |
NC0386 # 05 Y:2009 | 05 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,916 | $2,848 | Not Implemented |
NC0386 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,236 | $100 | Not Implemented |
NC0386 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,621 | $3,300 | Not Implemented |
NC0386 # 02 Y:2009 | 02 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,160 | $0 | Not Implemented |
NC0386 # 01 Y:2009 | 01 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $31,742 | $49,000 | Not Implemented |
NC0386 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $6,974 | $8,400 | Not Implemented |
NC0365 # 02 Y:2007 | 02 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,898 | $7,000 | Implemented |
NC0365 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $6,133 | $12,000 | Implemented |
NC0365 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,788 | $50 | Implemented |
NC0365 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,833 | $71,577 | Not Implemented |
NC0365 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,542 | $100 | Implemented |
NC0365 # 01 Y:2007 | 01 | 2007 | REDUCE VENTILATION AIR | $11,968 | $28,000 | Implemented |
NC0123 # 01 Y:1997 | 01 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,987 | $0 | Implemented |
NC0123 # 11 Y:1997 | 11 | 1997 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $10,775 | $0 | Implemented |
NC0123 # 10 Y:1997 | 10 | 1997 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $375 | $200 | Implemented |
NC0123 # 09 Y:1997 | 09 | 1997 | REDUCE SCRAP PRODUCTION | $3,429 | $15,000 | Not Implemented |
NC0123 # 08 Y:1997 | 08 | 1997 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $14,528 | $12,000 | Not Implemented |
NC0123 # 07 Y:1997 | 07 | 1997 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $926 | $200 | Not Implemented |
NC0123 # 06 Y:1997 | 06 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,282 | $14,319 | Not Implemented |
NC0123 # 05 Y:1997 | 05 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $376 | $400 | Not Implemented |
NC0123 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $126 | $25 | Not Implemented |
NC0123 # 03 Y:1997 | 03 | 1997 | ADD AREA LIGHTING SWITCHES | $1,475 | $2,000 | Not Implemented |