Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0011 # 01 Y:1984 | 01 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,259 | $0 | Implemented |
ST0011 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $148 | $537 | Not Implemented |
ST0011 # 03 Y:1984 | 03 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,083 | $190 | Implemented |
ST0011 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,210 | $56 | Implemented |
ST0011 # 09 Y:1984 | 09 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $668 | $500 | Implemented |
ST0011 # 05 Y:1984 | 05 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $138 | $0 | Implemented |
ST0011 # 04 Y:1984 | 04 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,107 | $2,290 | Implemented |
ST0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $93 | $45 | Implemented |
ST0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $435 | Implemented |
TS0011 # 05 Y:1984 | 05 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $217 | $0 | Not Implemented |
TS0011 # 04 Y:1984 | 04 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $677 | $2,376 | Not Implemented |
TS0011 # 08 Y:1984 | 08 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $481 | $800 | Not Implemented |
TS0011 # 06 Y:1984 | 06 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $242 | $500 | Not Implemented |
TS0011 # 03 Y:1984 | 03 | 1984 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,415 | $0 | Not Implemented |
TS0011 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $246 | $0 | Not Implemented |
TS0011 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,244 | $500 | Not Implemented |
LT0008 # 02 Y:1984 | 02 | 1984 | COVER OPEN TANKS | $134 | $204 | Not Implemented |
LT0008 # 01 Y:1984 | 01 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $380 | $300 | Implemented |
LT0008 # 03 Y:1984 | 03 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $452 | $375 | Implemented |
KU0135 # 15 Y:1984 | 15 | 1984 | IMPROVE LUBRICATION PRACTICES | $1,143 | $25 | Not Implemented |
KU0135 # 14 Y:1984 | 14 | 1984 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,763 | $3,100 | Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |
KU0135 # 06 Y:1984 | 06 | 1984 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,809 | $3,750 | Not Implemented |
KU0135 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,516 | $2,774 | Not Implemented |
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |