Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,613
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0377 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $871 | $0 | n/a |
MZ0377 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,928 | $9,400 | n/a |
MZ0377 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,340 | $2,300 | n/a |
MZ0377 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $200 | n/a |
MZ0377 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,503 | $3,660 | n/a |
MZ0377 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $498 | $415 | n/a |
MZ0377 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $26,142 | $43,500 | n/a |
MZ0377 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $31,698 | $9,040 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UU0267 # 07 Y:2025 | 07 | 2025 | USE AUTOMATIC FLOW CONTROL | $2,903 | $6,218 | n/a |
UU0267 # 04 Y:2025 | 04 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,650 | $9,727 | n/a |
UU0267 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,456 | $3,600 | n/a |
UU0267 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,113 | $29,674 | n/a |
UU0267 # 08 Y:2025 | 08 | 2025 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $12,294 | $19,900 | n/a |
UU0267 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,200 | $6,000 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UU0267 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,730 | $6,750 | n/a |
TT0324 # 09 Y:2025 | 09 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,799 | $60 | n/a |
TT0324 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,944 | $82,992 | n/a |