Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0346 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $414 | $525 | Not Implemented |
LE0346 # 03 Y:2012 | 03 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,292 | $12,880 | Implemented |
LE0346 # 02 Y:2012 | 02 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,634 | $1,800 | Not Implemented |
LE0346 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,166 | $3,152 | Implemented |
LE0346 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,093 | $14,250 | Implemented |
LE0346 # 07 Y:2012 | 07 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $129 | $109 | Not Implemented |
LE0346 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $94 | $500 | Not Implemented |
WM0006 # 05 Y:2012 | 05 | 2012 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,994 | $191 | Implemented |
WM0006 # 08 Y:2012 | 08 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $15,810 | $0 | Not Implemented |
WM0006 # 09 Y:2012 | 09 | 2012 | IMPROVE SPACE COMFORT CONDITIONING | $6,854 | $884 | Not Implemented |
WM0006 # 06 Y:2012 | 06 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $772 | $0 | Implemented |
WM0006 # 01 Y:2012 | 01 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $444 | $0 | Not Implemented |
WM0006 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,926 | $0 | Not Implemented |
WM0006 # 04 Y:2012 | 04 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $22,037 | $0 | Implemented |
WM0006 # 07 Y:2012 | 07 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $341 | $0 | Not Implemented |
WM0006 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,581 | $488 | Implemented |
DL0093 # 08 Y:2012 | 08 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $974 | $480 | Implemented |
DL0093 # 09 Y:2012 | 09 | 2012 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $480 | $425 | Not Implemented |
DL0093 # 03 Y:2012 | 03 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,360 | $50 | Not Implemented |
DL0093 # 07 Y:2012 | 07 | 2012 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $360 | $20 | Not Implemented |
DL0093 # 01 Y:2012 | 01 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,140 | $100 | Implemented |
DL0093 # 04 Y:2012 | 04 | 2012 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,680 | $5,000 | Not Implemented |
DL0093 # 06 Y:2012 | 06 | 2012 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $940 | $230 | Not Implemented |
DL0093 # 05 Y:2012 | 05 | 2012 | REDUCE VENTILATION AIR | $1,102 | $600 | Not Implemented |
DL0093 # 02 Y:2012 | 02 | 2012 | USE RADIANT HEATER FOR SPOT HEATING | $2,870 | $818 | Not Implemented |