IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0346 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $414 $525 Not Implemented
LE0346 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,292 $12,880 Implemented
LE0346 # 02 Y:2012 02 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,634 $1,800 Not Implemented
LE0346 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,166 $3,152 Implemented
LE0346 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,093 $14,250 Implemented
LE0346 # 07 Y:2012 07 2012 INSTALL TIMERS AND/OR THERMOSTATS $129 $109 Not Implemented
LE0346 # 05 Y:2012 05 2012 RECOVER WASTE HEAT FROM EQUIPMENT $94 $500 Not Implemented
WM0006 # 05 Y:2012 05 2012 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,994 $191 Implemented
WM0006 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,810 $0 Not Implemented
WM0006 # 09 Y:2012 09 2012 IMPROVE SPACE COMFORT CONDITIONING $6,854 $884 Not Implemented
WM0006 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $772 $0 Implemented
WM0006 # 01 Y:2012 01 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $444 $0 Not Implemented
WM0006 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,926 $0 Not Implemented
WM0006 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,037 $0 Implemented
WM0006 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $341 $0 Not Implemented
WM0006 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,581 $488 Implemented
DL0093 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $974 $480 Implemented
DL0093 # 09 Y:2012 09 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $480 $425 Not Implemented
DL0093 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,360 $50 Not Implemented
DL0093 # 07 Y:2012 07 2012 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $360 $20 Not Implemented
DL0093 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,140 $100 Implemented
DL0093 # 04 Y:2012 04 2012 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $1,680 $5,000 Not Implemented
DL0093 # 06 Y:2012 06 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $940 $230 Not Implemented
DL0093 # 05 Y:2012 05 2012 REDUCE VENTILATION AIR $1,102 $600 Not Implemented
DL0093 # 02 Y:2012 02 2012 USE RADIANT HEATER FOR SPOT HEATING $2,870 $818 Not Implemented