IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2209 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,163 $34,256 Implemented
KS2209 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,315 $60 Not Implemented
KS2209 # 02 Y:2022 02 2022 PAY UTILITY BILLS ON TIME $593 $0 Implemented
KS2209 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $77,094 $526,518 Implemented
KS2209 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,610 $1,085 Not Implemented
KS2209 # 08 Y:2022 08 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,738 $627,000 Not Implemented
KS2209 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,552 $5,960 Not Implemented
KS2209 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $24,875 $1,600 Implemented
SU0525 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,482 $0 Not Implemented
SU0525 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $108 $13 Not Implemented
SU0525 # 06 Y:2022 06 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,807 $3,000 Not Implemented
SU0525 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,101 $350 Not Implemented
SU0525 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,215 $2,239 Not Implemented
SU0525 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,804 $450 Not Implemented
SU0525 # 09 Y:2022 09 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $487 Not Implemented
SU0525 # 08 Y:2022 08 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $305 $664 Not Implemented
SU0525 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,346 $12,588 Not Implemented
LT8362 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,079 $0 n/a
LT8362 # 04 Y:2022 04 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $808 $29,000 n/a
LT8362 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,938 $0 n/a
LT8362 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $10,089 $0 n/a
LT8362 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $673 $0 n/a
LT8362 # 07 Y:2022 07 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $223 $180 n/a
LT8362 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,493 $30,000 n/a
AM0852 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $420 $235 Implemented