IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

231

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0554 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $82,048 $526,750 Implemented
SU0554 # 09 Y:2024 09 2024 USE HEAT PUMP FOR SPACE CONDITIONING $12,437 $105,375 Implemented
SU0554 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,419 $54 Implemented
SU0554 # 02 Y:2024 02 2024 PAY BILLS ON TIME TO AVOID LATE FEES $1,907 $0 Implemented
SU0554 # 05 Y:2024 05 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,553 $84 Implemented
UA0284 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $500 Implemented
UA0284 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,690 $13,427 Implemented
UA0284 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,762 $8,114 Implemented
OK1106 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,422 $50,026 Implemented
OK1106 # 05 Y:2024 05 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,777 $4,495 Implemented
LS2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,771 $3,080 Implemented
LS2404 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $5,988 $275 Implemented
LS2404 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,458 $11,138 Implemented
LS2404 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $135 Implemented
LT8370 # 03 Y:2023 03 2023 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $24,363 $0 Implemented
LT8370 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,034 $0 Implemented
LT8370 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,372 $1,800 Implemented
MI0387 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,595 $1,980 Implemented
MI0387 # 10 Y:2021 10 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,403 $4,900 Implemented
MI0387 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,412 $780 Implemented
MI0387 # 06 Y:2021 06 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,824 $120 Implemented
MI0387 # 01 Y:2021 01 2021 AIR CONDITION ONLY SPACE NECESSARY $12,419 $16,940 Implemented
MI0387 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,993 $4,308 Implemented
AS0497 # 04 Y:2021 04 2021 INSTALL SPECTRAL REFLECTORS / DELAMP $3,053 $678 Implemented
AS0497 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,810 $9,023 Implemented