IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0544 # 09 Y:2015 09 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,678 $200 Not Implemented
NC0544 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,734 $100 Implemented
NC0544 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,848 $2,250 Implemented
NC0544 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,316 $2,500 Not Implemented
NC0544 # 04 Y:2015 04 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $4,598 $10,000 Implemented
NC0544 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $579 $2,000 Not Implemented
NC0544 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,344 $3,049 Implemented
NC0544 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,531 $563 Implemented
NC0544 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $806 $1,588 Not Implemented
NC0206 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $270 Implemented
NC0206 # 10 Y:2001 10 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,210 $6,000 Not Implemented
NC0206 # 09 Y:2001 09 2001 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,200 $2,500 Not Implemented
NC0206 # 08 Y:2001 08 2001 REDESIGN PROCESS $9,810 $40,000 Implemented
NC0206 # 07 Y:2001 07 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,568 $0 Not Implemented
NC0206 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $307 $65 Not Implemented
NC0206 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,083 $32,849 Not Implemented
NC0206 # 04 Y:2001 04 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $204 $525 Implemented
NC0206 # 02 Y:2001 02 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,202 $2,000 Not Implemented
NC0206 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $373 $100 Not Implemented
NC0124 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,826 $401 Not Implemented
NC0124 # 01 Y:1997 01 1997 AIR CONDITION ONLY SPACE NECESSARY $9,590 $3,000 Implemented
NC0124 # 03 Y:1997 03 1997 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,715 $15,000 Not Implemented
NC0124 # 04 Y:1997 04 1997 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,906 $6,030 Not Implemented
NC0124 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $790 $270 Implemented
NC0124 # 06 Y:1997 06 1997 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $245 $10 Not Implemented