Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3491 | Industrial Valves |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0544 # 09 Y:2015 | 09 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,678 | $200 | Not Implemented |
NC0544 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,734 | $100 | Implemented |
NC0544 # 02 Y:2015 | 02 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,848 | $2,250 | Implemented |
NC0544 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,316 | $2,500 | Not Implemented |
NC0544 # 04 Y:2015 | 04 | 2015 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,598 | $10,000 | Implemented |
NC0544 # 05 Y:2015 | 05 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $579 | $2,000 | Not Implemented |
NC0544 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,344 | $3,049 | Implemented |
NC0544 # 07 Y:2015 | 07 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,531 | $563 | Implemented |
NC0544 # 08 Y:2015 | 08 | 2015 | INSTALL OCCUPANCY SENSORS | $806 | $1,588 | Not Implemented |
NC0206 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $589 | $270 | Implemented |
NC0206 # 10 Y:2001 | 10 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,210 | $6,000 | Not Implemented |
NC0206 # 09 Y:2001 | 09 | 2001 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,200 | $2,500 | Not Implemented |
NC0206 # 08 Y:2001 | 08 | 2001 | REDESIGN PROCESS | $9,810 | $40,000 | Implemented |
NC0206 # 07 Y:2001 | 07 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,568 | $0 | Not Implemented |
NC0206 # 06 Y:2001 | 06 | 2001 | INSULATE BARE EQUIPMENT | $307 | $65 | Not Implemented |
NC0206 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,083 | $32,849 | Not Implemented |
NC0206 # 04 Y:2001 | 04 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $204 | $525 | Implemented |
NC0206 # 02 Y:2001 | 02 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,202 | $2,000 | Not Implemented |
NC0206 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $373 | $100 | Not Implemented |
NC0124 # 02 Y:1997 | 02 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,826 | $401 | Not Implemented |
NC0124 # 01 Y:1997 | 01 | 1997 | AIR CONDITION ONLY SPACE NECESSARY | $9,590 | $3,000 | Implemented |
NC0124 # 03 Y:1997 | 03 | 1997 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,715 | $15,000 | Not Implemented |
NC0124 # 04 Y:1997 | 04 | 1997 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,906 | $6,030 | Not Implemented |
NC0124 # 05 Y:1997 | 05 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $790 | $270 | Implemented |
NC0124 # 06 Y:1997 | 06 | 1997 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $245 | $10 | Not Implemented |