IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3491 Industrial Valves
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0151 # 07 Y:1998 07 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $11,422 $2,500 Not Implemented
AR0151 # 06 Y:1998 06 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $2,894 $6,000 Not Implemented
AR0151 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $716 $0 Not Implemented
AR0151 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $413 $1,107 Not Implemented
AR0151 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,208 $17,401 Not Implemented
AR0151 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $602 $400 Not Implemented
AR0151 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,881 $200 Not Implemented
AR0148 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $637 $1,060 Not Implemented
AR0148 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,787 $1,000 Implemented
AR0148 # 07 Y:1998 07 1998 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,600 $6,000 Not Implemented
AR0148 # 06 Y:1998 06 1998 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $39,295 $91,825 Implemented
AR0148 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $40,673 $1,200 Implemented
AR0148 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,792 $850 Not Implemented
AR0148 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,475 $0 Not Implemented
AR0148 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,477 $500 Implemented
AR0148 # 09 Y:1998 09 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $4,143 $0 Not Implemented
WV0131 # 10 Y:1998 10 1998 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $35,500 $0 Not Implemented
WV0131 # 09 Y:1998 09 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,780 $5,000 Implemented
WV0131 # 08 Y:1998 08 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $262 $620 Implemented
WV0131 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $350 $225 Not Implemented
WV0131 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $53 $20 Not Implemented
WV0131 # 05 Y:1998 05 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,542 $3,816 Not Implemented
WV0131 # 04 Y:1998 04 1998 USE SYNTHETIC LUBRICANT $179 $336 Implemented
WV0131 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $115 $128 Not Implemented
WV0131 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $346 $1,956 Implemented