IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

382

matching recommendations
Reset
SIC 3492 Fluid Power Valves & Hose Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0063 # 06 Y:2011 06 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,516 $4,000 Not Implemented
TT0063 # 07 Y:2011 07 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,424 $120 Not Implemented
UM0363 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,083 $500 Implemented
UM0363 # 02 Y:2010 02 2010 RECOVER WASTE HEAT FROM EQUIPMENT $9,498 $10,000 Implemented
UM0363 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $7,516 $500 Not Implemented
UM0363 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,792 $200 Not Implemented
UM0363 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,241 $1,000 Implemented
UM0363 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $2,173 $1,375 Implemented
UM0363 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $542 $1,568 Implemented
BD0340 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93,388 $17,061 Not Implemented
BD0340 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $4,786 $1,501 Not Implemented
BD0340 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $381 Not Implemented
BD0340 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,817 $2 Not Implemented
BD0340 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,013 $1,501 Not Implemented
BD0340 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,540 $501 Not Implemented
BD0340 # 07 Y:2008 07 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,077 $2,001 Not Implemented
BD0340 # 08 Y:2008 08 2008 USE RADIANT HEATER FOR SPOT HEATING $8,829 $30,001 Not Implemented
BD0340 # 09 Y:2008 09 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,245 $12,000 Not Implemented
BD0340 # 10 Y:2008 10 2008 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $662,215 $1,001 Not Implemented
LE0242 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $734,219 $1,251,036 Implemented
LE0242 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $22,987 $20,000 Implemented
LE0242 # 03 Y:2006 03 2006 REUSE / RECYCLE/ SELL PAPER PRODUCTS $7,219 $960 Implemented
LE0242 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,843 $1,000 Implemented
LE0242 # 05 Y:2006 05 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,240 $6,400 Implemented
LE0242 # 06 Y:2006 06 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,001 $2,000 Implemented