IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 3492 Fluid Power Valves & Hose Fittings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0038 # 05 Y:2002 05 2002 AUTOMATE PAYROLL SYSTEM $19,920 $8,340 n/a
IC0038 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,392 $27,900 n/a
IC0038 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $2,536 n/a
IC0038 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,313 $13,137 n/a
IC0038 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,057 $2,300 n/a
TA0028 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,105 $390 Implemented
TA0028 # 05 Y:2002 05 2002 PAY BILLS ON TIME TO AVOID LATE FEES $3,380 $0 Implemented
TA0028 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,290 $40 Implemented
TA0028 # 03 Y:2002 03 2002 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $13,237 $0 Implemented
TA0028 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,860 $600 Implemented
TA0028 # 01 Y:2002 01 2002 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $36,360 $0 Not Implemented
BD0209 # 06 Y:2002 06 2002 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $540 $750 Not Implemented
BD0209 # 08 Y:2002 08 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $165,828 $350,000 Not Implemented
BD0209 # 07 Y:2002 07 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $210 $300 Not Implemented
BD0209 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $676 $0 Not Implemented
BD0209 # 04 Y:2002 04 2002 USE RADIANT HEATER FOR SPOT HEATING $704 $2,700 Implemented
BD0209 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $977 $600 Not Implemented
BD0209 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,724 $2,550 Not Implemented
BD0209 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $3,063 $1,050 Not Implemented
BD0207 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,416 $9,030 Not Implemented
BD0207 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $298 $400 Implemented
BD0207 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $280 Not Implemented
BD0207 # 06 Y:2002 06 2002 INSTALL STORM WINDOWS AND DOORS $374 $1,000 Not Implemented
BD0207 # 05 Y:2002 05 2002 INSTALL AUTOMATIC STACK DAMPER $608 $2,000 Not Implemented
BD0207 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $769 $0 Implemented