Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsSIC | 3493 | Steel Springs, Except Wire |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0363 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,224 | $7,680 | n/a |
MZ0363 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $68,717 | $580,125 | n/a |
MZ0363 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,485 | $2,460 | n/a |
MZ0363 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,670 | $29,120 | n/a |
AM0840 # 10 Y:2022 | 10 | 2022 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $86 | $179 | Implemented |
AM0840 # 09 Y:2022 | 09 | 2022 | USE PHOTOCELL CONTROLS | $170 | $50 | Not Implemented |
AM0840 # 01 Y:2022 | 01 | 2022 | OPTIMIZE PLANT POWER FACTOR | $20,260 | $33,400 | Not Implemented |
AM0840 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,045 | $17,675 | Implemented |
AM0840 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,290 | $1,000 | Implemented |
AM0840 # 04 Y:2022 | 04 | 2022 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,480 | $1,710 | Not Implemented |
AM0840 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,310 | $750 | Not Implemented |
AM0840 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $780 | $50 | Implemented |
AM0840 # 07 Y:2022 | 07 | 2022 | USE SYNTHETIC LUBRICANT | $665 | $450 | Not Implemented |
AM0840 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $360 | $260 | Not Implemented |
SF0462 # 03 Y:2015 | 03 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,475 | $793 | Implemented |
SF0462 # 01 Y:2015 | 01 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $3,033 | $0 | Implemented |
SF0462 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $2,234 | $4,284 | Implemented |
SF0462 # 09 Y:2015 | 09 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,227 | $11,712 | Not Implemented |
SF0462 # 02 Y:2015 | 02 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,285 | $0 | Implemented |
SF0462 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,459 | $24,914 | Implemented |
SF0462 # 05 Y:2015 | 05 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,415 | $12,500 | Not Implemented |
SF0462 # 06 Y:2015 | 06 | 2015 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $601 | $1,000 | Not Implemented |
SF0462 # 04 Y:2015 | 04 | 2015 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,104 | $1,941 | Implemented |
MA0736 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PLANT POWER FACTOR | $14,457 | $14,774 | Implemented |
MA0736 # 04 Y:2014 | 04 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,218 | $4,000 | Implemented |