IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
SIC 3493 Steel Springs, Except Wire
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0363 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,224 $7,680 n/a
MZ0363 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $68,717 $580,125 n/a
MZ0363 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,485 $2,460 n/a
MZ0363 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,670 $29,120 n/a
AM0840 # 10 Y:2022 10 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $86 $179 Implemented
AM0840 # 09 Y:2022 09 2022 USE PHOTOCELL CONTROLS $170 $50 Not Implemented
AM0840 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $20,260 $33,400 Not Implemented
AM0840 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,045 $17,675 Implemented
AM0840 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,290 $1,000 Implemented
AM0840 # 04 Y:2022 04 2022 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,480 $1,710 Not Implemented
AM0840 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,310 $750 Not Implemented
AM0840 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $50 Implemented
AM0840 # 07 Y:2022 07 2022 USE SYNTHETIC LUBRICANT $665 $450 Not Implemented
AM0840 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $360 $260 Not Implemented
SF0462 # 03 Y:2015 03 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,475 $793 Implemented
SF0462 # 01 Y:2015 01 2015 REPAIR AND ELIMINATE STEAM LEAKS $3,033 $0 Implemented
SF0462 # 07 Y:2015 07 2015 INSTALL OCCUPANCY SENSORS $2,234 $4,284 Implemented
SF0462 # 09 Y:2015 09 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,227 $11,712 Not Implemented
SF0462 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,285 $0 Implemented
SF0462 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,459 $24,914 Implemented
SF0462 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,415 $12,500 Not Implemented
SF0462 # 06 Y:2015 06 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $601 $1,000 Not Implemented
SF0462 # 04 Y:2015 04 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,104 $1,941 Implemented
MA0736 # 02 Y:2014 02 2014 OPTIMIZE PLANT POWER FACTOR $14,457 $14,774 Implemented
MA0736 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,218 $4,000 Implemented