Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

275

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2103 # 03 Y:2021 03 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $69,803 $0 Implemented
CL2103 # 05 Y:2021 05 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $349 $520 Implemented
CL2103 # 02 Y:2021 02 2021 PAY UTILITY BILLS ON TIME $812 $0 Implemented
AM0802 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,740 $4,500 Implemented
AM0802 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,175 $1,200 Implemented
AM0802 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,512 $2,280 Implemented
AM0802 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,146 $1,950 Implemented
AM0802 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $1,850 $0 Implemented
AM0802 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,090 $13,250 Implemented
AM0722 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $149,000 $471,100 Implemented
AM0722 # 06 Y:2017 06 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $980 $80 Implemented
AM0722 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,230 $1,000 Implemented
AM0722 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,000 $0 Implemented
AM0722 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,570 $1,000 Implemented
UA0140 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,564 $1,260 Implemented
UA0140 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,787 $1,522 Implemented
OK0852 # 06 Y:2013 06 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,139 $344 Implemented
OK0852 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,621 $2,310 Implemented
OK0852 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $1,388 Implemented
OK0852 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $838 $3,718 Implemented
OK0852 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $550 Implemented
UM0413 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $2,500 Implemented
UM0413 # 01 Y:2012 01 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,930 $1,000 Implemented
AM0611 # 02 Y:2012 02 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,320 $920 Implemented
AM0611 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,240 $500 Implemented