IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3494 Valves And Pipe Fittings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0302 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,323 $34,000 Not Implemented
SD0302 # 02 Y:2002 02 2002 INSTALL SKYLIGHTS $6,262 $2,000 Not Implemented
SD0302 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,968 $12,000 Not Implemented
SD0302 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,228 $0 Not Implemented
SD0302 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $964 $800 Not Implemented
SD0302 # 06 Y:2002 06 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,000 $10,000 Not Implemented
SD0302 # 07 Y:2002 07 2002 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $5,210 $6,000 Not Implemented
SD0302 # 08 Y:2002 08 2002 PAY UTILITY BILLS ON TIME $427 $0 Implemented
TA0024 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,600 $550 Implemented
TA0024 # 01 Y:2002 01 2002 UPGRADE CONTROLS ON COMPRESSORS $5,615 $400 Implemented
TA0024 # 11 Y:2002 11 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $200 $0 Not Implemented
TA0024 # 03 Y:2002 03 2002 CLEAN LINES WITH "PIGS" INSTEAD OF SOLVENTS / SOLUTIONS $4,915 $750 Not Implemented
TA0024 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $2,680 $635 Implemented
TA0024 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,290 $440 Implemented
TA0024 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,070 $700 Implemented
TA0024 # 07 Y:2002 07 2002 USE SYNTHETIC LUBRICANT $858 $0 Implemented
TA0024 # 08 Y:2002 08 2002 DISCONNECT BALLASTS $660 $675 Not Implemented
TA0024 # 09 Y:2002 09 2002 INSTALL OCCUPANCY SENSORS $560 $150 Implemented
TA0024 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $315 $640 Implemented
IA0285 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,274 $458 Implemented
IA0285 # 02 Y:2002 02 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $806 $237 Not Implemented
IA0285 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $449 $92 Not Implemented
IA0285 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,507 $800 Implemented
IA0285 # 05 Y:2002 05 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $46,580 $320 Implemented
IA0285 # 06 Y:2002 06 2002 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $12,642 $3,424 Implemented