Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0821 # 11 Y:2012 11 2012 OPTIMIZE PLANT POWER FACTOR $19,001 $9,750 Not Implemented
OK0821 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,921 $24,480 Not Implemented
OK0821 # 02 Y:2012 02 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,466 $2,840 Implemented
OK0821 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,363 $2,514 Not Implemented
OK0821 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,847 $15,486 Implemented
OK0821 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,712 $15,478 Implemented
OK0821 # 06 Y:2012 06 2012 UPGRADE CONTROLS ON COMPRESSORS $17,137 $0 Implemented
OK0821 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,375 $1,700 Implemented
OK0821 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,301 $0 Implemented
OK0821 # 09 Y:2012 09 2012 REPLACE BOILER $21,929 $26,400 Not Implemented
OK0821 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,699 $3,135 Not Implemented
OK0728 # 07 Y:2006 07 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,500 $0 Not Implemented
OK0728 # 06 Y:2006 06 2006 AIR CONDITION ONLY SPACE NECESSARY $6,517 $2,295 Not Implemented
OK0728 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $430 Not Implemented
OK0728 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,034 $1,994 Not Implemented
OK0728 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,567 $34,652 Not Implemented
OK0728 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $75,048 $240,000 Not Implemented
OK0728 # 01 Y:2006 01 2006 REDUCE VENTILATION AIR $35,971 $12,184 Not Implemented
OK0586 # 06 Y:1999 06 1999 IMPROVE SPACE COMFORT CONDITIONING $22,750 $50,000 Implemented
OK0586 # 05 Y:1999 05 1999 MOVE PRODUCT USING MECHANICAL MEANS $81,900 $50,000 Not Implemented
OK0586 # 04 Y:1999 04 1999 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $14,440 $30,000 Implemented
OK0586 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,681 $1,000 Implemented
OK0586 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,117 $6,500 Implemented
OK0586 # 01 Y:1999 01 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,100 $7,000 Not Implemented
OK0263 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,850 $1,482 Not Implemented