Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
661
matching recommendationsSIC | 3496 | Misc. Fabricated Wire Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0580 # 09 Y:1999 | 09 | 1999 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $1,418 | $0 | Not Implemented |
DS0145 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,985 | $8 | Implemented |
DS0145 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,434 | $462 | Implemented |
DS0145 # 03 Y:1999 | 03 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $15,332 | $945 | Not Implemented |
MA0440 # 01 Y:1999 | 01 | 1999 | CHANGE OPERATING CONDITIONS | $29,415 | $130,900 | Not Implemented |
MA0440 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,896 | $15,790 | Implemented |
MA0440 # 03 Y:1999 | 03 | 1999 | CHANGE OPERATING CONDITIONS | $2,562 | $27,140 | Not Implemented |
MA0440 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,444 | $3,400 | Implemented |
MA0440 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,278 | $5,204 | Implemented |
MA0440 # 06 Y:1999 | 06 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,349 | $70,000 | Not Implemented |
MA0440 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $709 | $1,245 | Implemented |
MA0440 # 08 Y:1999 | 08 | 1999 | MINIMIZE WATER USAGE | $6,136 | $10,000 | Not Implemented |
AM0336 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $84,980 | $80,500 | Implemented |
AM0336 # 02 Y:1999 | 02 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,750 | $0 | Implemented |
AM0336 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $640 | $800 | Not Implemented |
AM0336 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $100 | Implemented |
AM0336 # 05 Y:1999 | 05 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $460 | $0 | Not Implemented |
AM0336 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $290 | $14 | Not Implemented |
AM0336 # 07 Y:1999 | 07 | 1999 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $135 | $0 | Not Implemented |
AM0335 # 01 Y:1998 | 01 | 1998 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $19,840 | $320 | Not Implemented |
AM0335 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,790 | $250 | Implemented |
AM0335 # 03 Y:1998 | 03 | 1998 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,025 | $1,015 | Implemented |
AM0335 # 04 Y:1998 | 04 | 1998 | OPTIMIZE PLANT POWER FACTOR | $930 | $2,585 | Not Implemented |
AM0335 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,050 | $100 | Implemented |
AM0335 # 06 Y:1998 | 06 | 1998 | OPTIMIZE PLANT POWER FACTOR | $525 | $1,525 | Not Implemented |