IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0769 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $125 Not Implemented
AM0769 # 07 Y:2019 07 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $420 $0 Implemented
AM0769 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $350 $144 Not Implemented
AM0769 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
WV0540 # 01 Y:2017 01 2017 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $14,599 $10,000 Not Implemented
WV0540 # 02 Y:2017 02 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $11,734 $40,000 Not Implemented
WV0540 # 03 Y:2017 03 2017 INSULATE FEEDWATER TANK $7,035 $3,286 Not Implemented
WV0540 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $3,005 $3,800 Not Implemented
WV0540 # 05 Y:2017 05 2017 UPGRADE CONTROLS ON COMPRESSORS $2,223 $6,400 Not Implemented
WV0540 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $1,394 $635 Implemented
WV0540 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,287 $713 Implemented
WV0540 # 08 Y:2017 08 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,154 $5,500 Not Implemented
WV0540 # 09 Y:2017 09 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $883 $3,150 Not Implemented
WV0540 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $2,370 Implemented
WV0540 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $324 $1,001 Implemented
WV0540 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $303 $60 Implemented
WV0540 # 13 Y:2017 13 2017 INSTALL OCCUPANCY SENSORS $129 $135 Implemented
UD0949 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,996 $57,770 Implemented
UD0949 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $500 Not Implemented
UD0949 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Implemented
UD0949 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,976 $4,120 Not Implemented
UD0949 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $2,800 Not Implemented
UD0949 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,698 $2,125 Not Implemented
UD0949 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,312 $5,400 Implemented
IP0063 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,006 $2,156 Implemented