IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 3496 Misc. Fabricated Wire Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0949 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,996 $57,770 Implemented
UD0949 # 06 Y:2016 06 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $500 Not Implemented
UD0949 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Implemented
UD0949 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,976 $4,120 Not Implemented
UD0949 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,691 $2,800 Not Implemented
UD0949 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,698 $2,125 Not Implemented
UD0949 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,312 $5,400 Implemented
WV0331 # 06 Y:2006 06 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,523 $320 Implemented
WV0331 # 01 Y:2006 01 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,465 $18,600 Not Implemented
WV0331 # 11 Y:2006 11 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $438 $30 Not Implemented
WV0331 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $778 $1,460 Implemented
WV0331 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,352 $1,000 Implemented
WV0331 # 10 Y:2006 10 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $566 $1,370 Not Implemented
WV0331 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $686 $440 Implemented
WV0331 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,865 $22,825 Implemented
WV0331 # 03 Y:2006 03 2006 REDUCE VENTILATION AIR $9,874 $3,940 Not Implemented
WV0331 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,906 $1,560 Implemented
WV0331 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,957 $2,264 Implemented
UD0580 # 02 Y:1999 02 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $134,400 $400,000 Not Implemented
UD0580 # 03 Y:1999 03 1999 RECOVER AND REUSE COOLING WATER $52,000 $140,000 Not Implemented
UD0580 # 04 Y:1999 04 1999 MOVE PRODUCT USING MECHANICAL MEANS $39,393 $10,000 Not Implemented
UD0580 # 05 Y:1999 05 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $27,840 $3,500 Implemented
UD0580 # 06 Y:1999 06 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $27,804 $11,744 Implemented
UD0580 # 01 Y:1999 01 1999 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $862,392 $1,300,000 Not Implemented
UD0580 # 08 Y:1999 08 1999 FILTER AND REUSE HYDRAULIC OIL $1,713 $2,500 Not Implemented