Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
527
matching recommendationsSIC | 3498 | Fabricated Pipe And Fittings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0167 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,795 | $100 | Not Implemented |
UM0167 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,504 | $825 | Not Implemented |
UM0167 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,167 | $500 | Not Implemented |
UM0167 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,700 | $4,550 | Not Implemented |
UM0167 # 06 Y:2000 | 06 | 2000 | INSULATE BARE EQUIPMENT | $6,118 | $3,300 | Not Implemented |
UM0167 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $16,497 | $1,000 | Not Implemented |
UM0167 # 08 Y:2000 | 08 | 2000 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $7,288 | $11,000 | Not Implemented |
AR0185 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,559 | $260 | Implemented |
AR0185 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,930 | $0 | Not Implemented |
AR0185 # 03 Y:2000 | 03 | 2000 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $16,446 | $15,663 | Implemented |
AR0185 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $768 | $300 | Not Implemented |
AR0185 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,764 | $0 | Not Implemented |
AR0185 # 06 Y:2000 | 06 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $21,267 | $59,881 | Not Implemented |
AR0185 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $464,750 | $385,000 | Not Implemented |
OK0599 # 01 Y:2000 | 01 | 2000 | COMBINE UTILITY METERS | $15,427 | $10,600 | Not Implemented |
OK0599 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $777 | $3,841 | Not Implemented |
OK0599 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,866 | $1,300 | Not Implemented |
OK0599 # 04 Y:2000 | 04 | 2000 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $6,139 | $12,800 | Not Implemented |
OK0599 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $89,040 | $0 | Not Implemented |
OK0599 # 06 Y:2000 | 06 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $200,000 | $300,000 | Not Implemented |
OK0599 # 07 Y:2000 | 07 | 2000 | PURCHASE APPROPRIATELY SIZED MATERIAL | $224,052 | $150 | Not Implemented |
AS0278 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,451 | $5,643 | Not Implemented |
AS0278 # 02 Y:2000 | 02 | 2000 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $260 | $120 | Not Implemented |
AS0278 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,407 | $120 | Implemented |
AS0278 # 04 Y:2000 | 04 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $666 | $60 | Implemented |