Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 3498 | Fabricated Pipe And Fittings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0686 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,706 | $22,116 | Not Implemented |
OK0686 # 08 Y:2004 | 08 | 2004 | USE OPTIMUM THICKNESS INSULATION | $8,220 | $40,318 | Not Implemented |
OK0686 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $537 | $2,550 | Implemented |
OK0686 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,153 | $36,618 | Implemented |
OK0686 # 05 Y:2004 | 05 | 2004 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $70,533 | $81,950 | Not Implemented |
OK0686 # 04 Y:2004 | 04 | 2004 | INSTALL SET-BACK TIMERS | $1,577 | $1,320 | Implemented |
OK0686 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $3,350 | $1,136 | Implemented |
OK0686 # 02 Y:2004 | 02 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,472 | $262 | Implemented |
OK0686 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,360 | $160 | Not Implemented |
OK0667 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,471 | $1,855 | Not Implemented |
OK0667 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $551 | $2,519 | Not Implemented |
OK0667 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,265 | $0 | Not Implemented |
OK0667 # 10 Y:2003 | 10 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,803 | $500 | Not Implemented |
OK0667 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $5,401 | Not Implemented |
OK0667 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,918 | $367 | Not Implemented |
OK0667 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $604 | $643 | Not Implemented |
OK0667 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $931 | $185 | Not Implemented |
OK0667 # 01 Y:2003 | 01 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,098 | $4,390 | Not Implemented |
OK0667 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $670 | $760 | Not Implemented |
OK0667 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $1,957 | $564 | Not Implemented |
OK0610 # 04 Y:2001 | 04 | 2001 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $2,420 | $1,235 | Not Implemented |
OK0610 # 01 Y:2001 | 01 | 2001 | INSTALL SET-BACK TIMERS | $14,000 | $1,670 | Implemented |
OK0610 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,700 | $1,110 | Not Implemented |
OK0610 # 05 Y:2001 | 05 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $312,000 | $150,000 | Not Implemented |
OK0610 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,939 | $16,000 | Not Implemented |