Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 3498 | Fabricated Pipe And Fittings |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0455 # 06 Y:2003 | 06 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $716 | $0 | Not Implemented |
WI0455 # 05 Y:2003 | 05 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,232 | $1,240 | Not Implemented |
WI0455 # 04 Y:2003 | 04 | 2003 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $1,787 | $0 | Not Implemented |
WI0455 # 03 Y:2003 | 03 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $1,687 | $1,000 | Not Implemented |
WI0455 # 02 Y:2003 | 02 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,503 | $2,000 | Not Implemented |
WI0455 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $17,710 | $2,500 | Implemented |
OK0667 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,918 | $367 | Not Implemented |
OK0667 # 01 Y:2003 | 01 | 2003 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,098 | $4,390 | Not Implemented |
OK0667 # 02 Y:2003 | 02 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $1,957 | $564 | Not Implemented |
OK0667 # 03 Y:2003 | 03 | 2003 | INSTALL OCCUPANCY SENSORS | $670 | $760 | Not Implemented |
OK0667 # 04 Y:2003 | 04 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,471 | $1,855 | Not Implemented |
OK0667 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $931 | $185 | Not Implemented |
OK0667 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $604 | $643 | Not Implemented |
OK0667 # 07 Y:2003 | 07 | 2003 | INSULATE BARE EQUIPMENT | $551 | $2,519 | Not Implemented |
OK0667 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $652 | $5,401 | Not Implemented |
OK0667 # 10 Y:2003 | 10 | 2003 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $2,803 | $500 | Not Implemented |
OK0667 # 11 Y:2003 | 11 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,265 | $0 | Not Implemented |
LM0064 # 11 Y:2003 | 11 | 2003 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $360,180 | $118,080 | Implemented |
LM0064 # 13 Y:2003 | 13 | 2003 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $84,000 | $1,000 | Not Implemented |
LM0064 # 12 Y:2003 | 12 | 2003 | MODIFY CURRENT INCENTIVE PROGRAM | $34,000 | $5,000 | Implemented |
LM0064 # 10 Y:2003 | 10 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $144,153 | $2,500 | Not Implemented |
LM0064 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,721 | $320 | Implemented |
LM0064 # 02 Y:2003 | 02 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $76,727 | $9,000 | n/a |
LM0064 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,321 | $200 | Implemented |
LM0064 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,099 | $9,475 | Implemented |