Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0234 # 06 Y:2017 | 06 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,361 | $50 | Implemented |
MZ0234 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,800 | $0 | Implemented |
MZ0234 # 01 Y:2017 | 01 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $407 | $2,000 | Implemented |
MZ0234 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $1,354 | $1,550 | Implemented |
MZ0062 # 11 Y:2011 | 11 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,836 | $10,000 | Implemented |
MZ0062 # 09 Y:2011 | 09 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,053 | $9,000 | Implemented |
MZ0062 # 08 Y:2011 | 08 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,105 | $15,000 | Implemented |
MZ0062 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $26,441 | $1,300 | Implemented |
MZ0062 # 04 Y:2011 | 04 | 2011 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,360 | $100 | Implemented |
MZ0062 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,772 | $49,280 | Implemented |
MZ0062 # 01 Y:2011 | 01 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,242 | $1,160 | Implemented |
MZ0062 # 13 Y:2011 | 13 | 2011 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $91 | $300 | Implemented |
MZ0062 # 14 Y:2011 | 14 | 2011 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,657 | $150,000 | Implemented |
MZ0062 # 16 Y:2011 | 16 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $11,500 | $18,000 | Implemented |
MO0236 # 02 Y:1998 | 02 | 1998 | CHANGE OPERATING CONDITIONS | $553 | $380 | Implemented |
MO0236 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $1,717 | Implemented |
MO0236 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,639 | $2,805 | Implemented |
MO0236 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $206 | $0 | Implemented |
MO0236 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE WASTE MATERIAL | $49,600 | $15,000 | Implemented |
MO0196 # 04 Y:1997 | 04 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,048 | $1,583 | Implemented |
MO0196 # 05 Y:1997 | 05 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $215 | $0 | Implemented |
MO0196 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,497 | $197 | Implemented |
MO0196 # 02 Y:1997 | 02 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $4,725 | $10,000 | Implemented |
KU0373 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $271 | $180 | Implemented |
KU0373 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $331 | $101 | Implemented |