IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0234 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,361 $50 Implemented
MZ0234 # 02 Y:2017 02 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,800 $0 Implemented
MZ0234 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $407 $2,000 Implemented
MZ0234 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $1,354 $1,550 Implemented
MZ0062 # 11 Y:2011 11 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,836 $10,000 Implemented
MZ0062 # 09 Y:2011 09 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,053 $9,000 Implemented
MZ0062 # 08 Y:2011 08 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,105 $15,000 Implemented
MZ0062 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,441 $1,300 Implemented
MZ0062 # 04 Y:2011 04 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $1,360 $100 Implemented
MZ0062 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,772 $49,280 Implemented
MZ0062 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,242 $1,160 Implemented
MZ0062 # 13 Y:2011 13 2011 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $91 $300 Implemented
MZ0062 # 14 Y:2011 14 2011 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $11,657 $150,000 Implemented
MZ0062 # 16 Y:2011 16 2011 UPGRADE CONTROLS ON COMPRESSORS $11,500 $18,000 Implemented
MO0236 # 02 Y:1998 02 1998 CHANGE OPERATING CONDITIONS $553 $380 Implemented
MO0236 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $1,717 Implemented
MO0236 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,639 $2,805 Implemented
MO0236 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $206 $0 Implemented
MO0236 # 07 Y:1998 07 1998 RECOVER AND REUSE WASTE MATERIAL $49,600 $15,000 Implemented
MO0196 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $1,583 Implemented
MO0196 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $0 Implemented
MO0196 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,497 $197 Implemented
MO0196 # 02 Y:1997 02 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $4,725 $10,000 Implemented
KU0373 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $180 Implemented
KU0373 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $331 $101 Implemented