IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0093 # 01 Y:2012 01 2012 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,140 $100 Implemented
DL0093 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $974 $480 Implemented
OK0830 # 11 Y:2012 11 2012 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,434 $1,170 Implemented
OK0830 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $1,870 $378 Implemented
OK0830 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,068 $8,256 Implemented
OK0830 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,255 $1,300 Implemented
OK0830 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $565 $1,540 Implemented
OK0830 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $470 Implemented
NC0450 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $31,614 $21,400 Implemented
NC0450 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,109 $100 Implemented
NC0450 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,655 $98,739 Implemented
NC0450 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,286 $973 Implemented
NC0450 # 07 Y:2012 07 2012 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $113,534 $25,000 Implemented
NC0450 # 08 Y:2012 08 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $105,000 $40,000 Implemented
NC0450 # 09 Y:2012 09 2012 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $38,389 $30,000 Implemented
CO0656 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $53,300 Implemented
CO0656 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,280 $260 Implemented
CO0656 # 04 Y:2012 04 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,530 $4,000 Implemented
CO0656 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,170 $630 Implemented
SD0443 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $100 Implemented
SD0443 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,935 $2,500 Implemented
SD0443 # 03 Y:2012 03 2012 ADD AREA LIGHTING SWITCHES $420 $115 Implemented
SD0443 # 04 Y:2012 04 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,443 $618 Implemented
SD0443 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,415 $800 Implemented
SD0443 # 06 Y:2012 06 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,400 $2,500 Implemented