Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1124 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $8,880 | n/a |
OK1124 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,751 | $511,000 | n/a |
OK1124 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,553 | $5,538 | n/a |
OK1124 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $405 | $403 | n/a |
OK1124 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,780 | $520 | n/a |
OK1124 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $124,468 | $710,360 | n/a |
OK1124 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,690 | $117,898 | n/a |
LE0581 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,580 | $11,000 | n/a |
LE0581 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $336 | $270 | n/a |
LE0581 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,702 | $910 | n/a |
LE0581 # 05 Y:2024 | 05 | 2024 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $921 | $4,500 | n/a |
LE0581 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,575 | $12,275 | n/a |
MS0430 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $41,187 | $175,000 | n/a |
MS0430 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,494 | $0 | n/a |
MS0430 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $159,708 | $984,550 | n/a |
MS0430 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $80 | $1,259 | n/a |
UD1081 # 07 Y:2024 | 07 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,626 | $7,875 | n/a |
UD1081 # 02 Y:2024 | 02 | 2024 | REDUCE FLUID FLOW RATES | $29,869 | $3,076 | n/a |
UD1081 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,481 | $730 | n/a |
UD1081 # 03 Y:2024 | 03 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $55,362 | $6,264 | n/a |
UD1081 # 04 Y:2024 | 04 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,442 | $0 | n/a |
UD1081 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $792 | $0 | n/a |
UD1081 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,187 | $1,235 | n/a |
UD1081 # 09 Y:2024 | 09 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,380 | $17,600 | n/a |
UD1081 # 08 Y:2024 | 08 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,404 | $0 | n/a |