Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2319 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $593 | $60 | n/a |
KS2319 # 03 Y:2023 | 03 | 2023 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,009 | $5,440 | n/a |
KS2319 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $307 | $119 | n/a |
KS2319 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,663 | $19,796 | n/a |
KS2319 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $123,311 | $1,196,880 | n/a |
KS2319 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,385 | $5,960 | n/a |
NC0523 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $58,620 | $90,000 | Not Implemented |
NC0523 # 14 Y:2014 | 14 | 2014 | DEVELOP A REPAIR/REPLACE POLICY | $2,088 | $4,256 | Not Implemented |
NC0523 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $146,762 | Not Implemented |
NC0523 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $8,560 | $2,500 | Not Implemented |
NC0523 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $944 | $3,012 | Implemented |
NC0523 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $176 | $200 | Implemented |
NC0523 # 08 Y:2014 | 08 | 2014 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $11,195 | $20,000 | Not Implemented |
NC0523 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,387 | $20,000 | Not Implemented |
NC0523 # 10 Y:2014 | 10 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,411 | $12,000 | Not Implemented |
NC0523 # 11 Y:2014 | 11 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,120 | $1,000 | Implemented |
NC0523 # 12 Y:2014 | 12 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,179 | $50 | Implemented |
NC0523 # 13 Y:2014 | 13 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,803 | $1,935 | Implemented |
NC0523 # 02 Y:2014 | 02 | 2014 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $78,330 | $120,000 | Not Implemented |
NC0523 # 01 Y:2014 | 01 | 2014 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,000 | $600,000 | Not Implemented |
NC0094 # 10 Y:1996 | 10 | 1996 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $21,205 | $54,000 | Not Implemented |
NC0094 # 09 Y:1996 | 09 | 1996 | USE EVAPORATION TO CONCENTRATE MATERIAL | $11,533 | $25,000 | Implemented |
NC0094 # 08 Y:1996 | 08 | 1996 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $197 | $50 | Not Implemented |
NC0094 # 07 Y:1996 | 07 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $100 | $420 | Implemented |
NC0094 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $275 | $250 | Not Implemented |