Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,117
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0256 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $4,834 | $26,380 | Not Implemented |
MZ0256 # 08 Y:2018 | 08 | 2018 | USE SOLAR HEAT TO HEAT WATER | $6,041 | $66,682 | Not Implemented |
IP0095 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,935 | $25 | Implemented |
IP0095 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,023 | $2,041 | Implemented |
IP0095 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $68,255 | $11,125 | Implemented |
IP0095 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $17,327 | $3,124 | Not Implemented |
IP0095 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,822 | $835 | Not Implemented |
IP0095 # 06 Y:2018 | 06 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,356 | $3,070 | Implemented |
IP0095 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $2,961 | $1,093 | Implemented |
IP0095 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,700 | $6,580 | Not Implemented |
IP0095 # 09 Y:2018 | 09 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,060 | $2,194 | Not Implemented |
IP0095 # 10 Y:2018 | 10 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,136 | $3,970 | Implemented |
IP0095 # 11 Y:2018 | 11 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $843 | $1,000 | Not Implemented |
OK0967 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,854 | $3,960 | Not Implemented |
OK0967 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,932 | $35,800 | Not Implemented |
OK0967 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $776 | $2,508 | Not Implemented |
OK0967 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,303 | $7,634 | Not Implemented |
OK0967 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,380 | $6,786 | Not Implemented |
OK0967 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,739 | $2,695 | Not Implemented |
OK0967 # 07 Y:2017 | 07 | 2017 | INSTALL SET-BACK TIMERS | $1,719 | $1,020 | Not Implemented |
OK0967 # 08 Y:2017 | 08 | 2017 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $687 | $2,800 | Not Implemented |
OK0967 # 09 Y:2017 | 09 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,124 | $30,000 | Not Implemented |
GT0902 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,435 | $6,000 | Not Implemented |
GT0902 # 02 Y:2017 | 02 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,872 | $6,000 | Not Implemented |
GT0902 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $50 | $197 | Implemented |