IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0327 # 05 Y:2007 05 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $15,124 $6,800 Not Implemented
BD0327 # 04 Y:2007 04 2007 INSTALL REPLACEMENT DOORS $7,558 $20,000 Not Implemented
BD0327 # 03 Y:2007 03 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,520 $600 Not Implemented
BD0327 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $4,257 $600 Not Implemented
BD0327 # 10 Y:2007 10 2007 INSTALL OCCUPANCY SENSORS $1,702 $1,200 Not Implemented
BD0327 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,900 $9,230 Not Implemented
BD0327 # 08 Y:2007 08 2007 USE PHOTOCELL CONTROLS $36,411 $10,000 Not Implemented
BD0327 # 07 Y:2007 07 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,763 $0 Not Implemented
BD0327 # 11 Y:2007 11 2007 LOWER CEILING TO REDUCE CONDITIONED SPACE $816 $1,460 Not Implemented
BD0327 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $1,018 $1,000 Not Implemented
IC0108 # 01 Y:2005 01 2005 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $85,726 $22,992 Not Implemented
IC0108 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $500 $300 Not Implemented
IC0108 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $77 $0 Not Implemented
IC0108 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,427 $0 Not Implemented
IC0108 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $425 $0 Not Implemented
IC0108 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,400 $0 Not Implemented
IC0092 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $900 $2,340 Not Implemented
IC0092 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $4,634 $0 Not Implemented
IC0092 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,934 $38,438 Not Implemented
IC0092 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,152 $6,700 Not Implemented
IC0092 # 02 Y:2004 02 2004 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,325 $0 Not Implemented
IC0092 # 01 Y:2004 01 2004 INSTALL TIMERS AND/OR THERMOSTATS $4,234 $30 Not Implemented
IC0092 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,783 $17,315 Not Implemented
IC0092 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $1,120 $3,002 Not Implemented
IC0092 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $487 $1,544 Not Implemented