IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0450 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,286 $973 Implemented
NC0426 # 07 Y:2011 07 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,569 $21,550 Not Implemented
NC0426 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98 $100 Implemented
NC0426 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $302 $25 Implemented
NC0426 # 04 Y:2011 04 2011 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $1,171 $4,700 Not Implemented
NC0426 # 03 Y:2011 03 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,690 $3,750 Not Implemented
NC0426 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $1,530 Implemented
NC0426 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,495 $2,825 Not Implemented
NC0250 # 06 Y:2002 06 2002 INSTALL BACK-UP EQUIPMENT $13,440 $35,000 Not Implemented
NC0250 # 09 Y:2002 09 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,251 $420 Implemented
NC0250 # 08 Y:2002 08 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $322 $921 Not Implemented
NC0250 # 07 Y:2002 07 2002 DEVELOP A REPAIR/REPLACE POLICY $798 $1,293 Not Implemented
NC0250 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $65,851 $10,750 Not Implemented
NC0250 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $12,244 $12,245 Not Implemented
NC0250 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $11,259 $20,000 Not Implemented
NC0250 # 02 Y:2002 02 2002 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $37,000 $12,000 n/a
NC0250 # 01 Y:2002 01 2002 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $13,524 $16,000 n/a
NC0108 # 08 Y:1997 08 1997 REDUCE SCRAP PRODUCTION $31,045 $15,000 Implemented
NC0108 # 07 Y:1997 07 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $102,104 $5,000 Implemented
NC0108 # 06 Y:1997 06 1997 CONVERT TO ELECTROSTATIC POWDER COATING $3,380 $1,000 Implemented
NC0108 # 05 Y:1997 05 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,780 $10,000 Not Implemented
NC0108 # 04 Y:1997 04 1997 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $12,532 $6,000 Not Implemented
NC0108 # 03 Y:1997 03 1997 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,625 $8,500 Not Implemented
NC0108 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $405 $1,680 Implemented
NC0108 # 01 Y:1997 01 1997 INSTALL OCCUPANCY SENSORS $659 $250 Not Implemented