Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73
matching recommendationsSIC | 3499 | Fabricated Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0450 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $973 | Implemented |
NC0426 # 07 Y:2011 | 07 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $5,569 | $21,550 | Not Implemented |
NC0426 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $98 | $100 | Implemented |
NC0426 # 05 Y:2011 | 05 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $302 | $25 | Implemented |
NC0426 # 04 Y:2011 | 04 | 2011 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $1,171 | $4,700 | Not Implemented |
NC0426 # 03 Y:2011 | 03 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,690 | $3,750 | Not Implemented |
NC0426 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $815 | $1,530 | Implemented |
NC0426 # 01 Y:2011 | 01 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,495 | $2,825 | Not Implemented |
NC0250 # 06 Y:2002 | 06 | 2002 | INSTALL BACK-UP EQUIPMENT | $13,440 | $35,000 | Not Implemented |
NC0250 # 09 Y:2002 | 09 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,251 | $420 | Implemented |
NC0250 # 08 Y:2002 | 08 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $322 | $921 | Not Implemented |
NC0250 # 07 Y:2002 | 07 | 2002 | DEVELOP A REPAIR/REPLACE POLICY | $798 | $1,293 | Not Implemented |
NC0250 # 05 Y:2002 | 05 | 2002 | AIR CONDITION ONLY SPACE NECESSARY | $65,851 | $10,750 | Not Implemented |
NC0250 # 04 Y:2002 | 04 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,244 | $12,245 | Not Implemented |
NC0250 # 03 Y:2002 | 03 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,259 | $20,000 | Not Implemented |
NC0250 # 02 Y:2002 | 02 | 2002 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $37,000 | $12,000 | n/a |
NC0250 # 01 Y:2002 | 01 | 2002 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $13,524 | $16,000 | n/a |
NC0108 # 08 Y:1997 | 08 | 1997 | REDUCE SCRAP PRODUCTION | $31,045 | $15,000 | Implemented |
NC0108 # 07 Y:1997 | 07 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $102,104 | $5,000 | Implemented |
NC0108 # 06 Y:1997 | 06 | 1997 | CONVERT TO ELECTROSTATIC POWDER COATING | $3,380 | $1,000 | Implemented |
NC0108 # 05 Y:1997 | 05 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,780 | $10,000 | Not Implemented |
NC0108 # 04 Y:1997 | 04 | 1997 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $12,532 | $6,000 | Not Implemented |
NC0108 # 03 Y:1997 | 03 | 1997 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,625 | $8,500 | Not Implemented |
NC0108 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $405 | $1,680 | Implemented |
NC0108 # 01 Y:1997 | 01 | 1997 | INSTALL OCCUPANCY SENSORS | $659 | $250 | Not Implemented |