IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,117

matching recommendations
Reset
SIC 3499 Fabricated Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0688 # 15 Y:2004 15 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,100 $1,500 Not Implemented
UD0688 # 16 Y:2004 16 2004 COVER OPEN TANKS $2,010 $2,440 Not Implemented
UD0688 # 17 Y:2004 17 2004 REDUCE VENTILATION AIR $1,805 $73 Not Implemented
UD0688 # 18 Y:2004 18 2004 INSULATE BARE EQUIPMENT $880 $1,820 Implemented
LE0170 # 01 Y:2003 01 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $210,423 $300,000 Not Implemented
LE0170 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,647 $7,000 Implemented
LE0170 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $952 $0 Implemented
LE0170 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $367 $0 Implemented
LE0170 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $440 $560 Not Implemented
LE0170 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $425 $825 Not Implemented
TA0054 # 01 Y:2003 01 2003 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $1,000,000 $25,150 Not Implemented
TA0054 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,893 $0 Implemented
TA0054 # 03 Y:2003 03 2003 USE OPTIMUM TEMPERATURE $1,215 $0 Implemented
TA0054 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $907 $54 Not Implemented
TA0054 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $1,550 Implemented
TA0054 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $316 $0 Implemented
TA0054 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $266 $444 Implemented
SU0158 # 01 Y:2003 01 2003 REPAIR OR REPLACE STEAM TRAPS $161,780 $4,536 Implemented
SU0158 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152,410 $301,250 Not Implemented
SU0158 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,164 $235,000 Not Implemented
SU0158 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,325 $5,200 Implemented
SU0158 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $24,189 $70,275 Not Implemented
SU0158 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $10,573 $1,000 Implemented
SU0158 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,432 $0 Implemented
SU0158 # 08 Y:2003 08 2003 RECOVER AND REUSE SPENT ACID BATHS $7,052 $6,521 Not Implemented